{"id":671,"date":"2023-07-13T17:47:42","date_gmt":"2023-07-13T17:47:42","guid":{"rendered":"http:\/\/audit.gov.ms\/?p=671"},"modified":"2023-07-13T17:47:42","modified_gmt":"2023-07-13T17:47:42","slug":"sai-pmf-review-workshop-conducted-in-the-carosai-region-3-7-july-2023","status":"publish","type":"post","link":"http:\/\/audit.gov.ms\/?p=671","title":{"rendered":"SAI PMF Review Workshop conducted in the CAROSAI Region (3-7 July 2023)"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><a href=\"http:\/\/audit.gov.ms\/wp-content\/uploads\/2023\/07\/curacao_sai.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"619\" src=\"http:\/\/audit.gov.ms\/wp-content\/uploads\/2023\/07\/curacao_sai-1024x619.jpg\" alt=\"\" class=\"wp-image-675\"\/><\/a><figcaption class=\"wp-element-caption\">IDI &#8211; SAI PMF Review Workshop Delegation. SAIs included Cura\u00e7ao, Grenada, Montserrat, and St Vincent and the Grenadines.<\/figcaption><\/figure>\n\n\n\n<p>The IDI, in collaboration with the CAROSAI Secretariat, recently conducted a SAI PMF Review Workshop in the CAROSAI Region. This workshop was organized for the SAIs participating in the second round of the IDI-CAROSAI SAI PMF Facilitation Programme. The workshop took place in Cura\u00e7ao from 3 to 7 July 2023 and was attended by 12 participants. The participating SAIs included Cura\u00e7ao, Grenada, Montserrat, and St Vincent and the Grenadines.<\/p>\n\n\n\n<p>The main objective of the review workshop was to assess the progress made by the SAIs in their SAI PMF self-assessments, which began with fieldwork in February 2023. Furthermore, the workshop aimed to provide the assessment teams with the necessary knowledge and skills to conduct a root cause analysis and produce a qualitative assessment of the SAIs&#8217; performance. This review workshop plays a crucial role in finalizing the draft performance reports.<\/p>\n\n\n\n<p>Going forward, the assessment teams are expected to revise their draft performance reports based on the guidance provided during the workshop. Additionally, they are required to conduct a root cause analysis of performance and draft a section highlighting key findings and observations on the SAI&#8217;s performance and impact.<\/p>\n\n\n\n<p>According to the agreed roadmap, the final performance reports, including an independent review statement issued by the IDI, are anticipated to be completed by 31 October 2023. To ensure high-quality and timely completion, the IDI will continue to offer remote support to the assessment teams throughout the remaining phases of the assessment process.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The IDI, in collaboration with the CAROSAI Secretariat, recently conducted a SAI PMF Review Workshop in the CAROSAI Region. This workshop was organized for the SAIs participating in the second round of the IDI-CAROSAI SAI PMF Facilitation Programme. The workshop took place in Cura\u00e7ao from 3 to 7 July 2023 and was attended by 12 [&hellip;]<\/p>\n","protected":false},"author":1001003,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/posts\/671"}],"collection":[{"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/users\/1001003"}],"replies":[{"embeddable":true,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=671"}],"version-history":[{"count":2,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/posts\/671\/revisions"}],"predecessor-version":[{"id":676,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=\/wp\/v2\/posts\/671\/revisions\/676"}],"wp:attachment":[{"href":"http:\/\/audit.gov.ms\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=671"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=671"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/audit.gov.ms\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}